View Quote "Blow-down, expansion and cooling module BEM" was successfully added to your quote.

Construction

The module consists of an expansion tank as well as a waste water and cooling tank. A heat exchanger with associated fittings is integrated for heat recovery.

Equipment level 

Two cylinders one above the other sealed off with blank plates at both ends, a pick-up station, all necessary fittings, the piping one below the other and thermal insulation are included in the scope of delivery and are offered ex works fully assembled.